NEWS
- 01.11.2012 - Ryerson's Student Learning Centre design wins national award of excellence
- 01.09.2012 - National magazine lauds Student Learning Centre design
- 11.24.2011 - EllisDon awarded new contract to build new Ryerson University Student Learning Centre.
- 04.06.2010 - Student Learning Centre will provide Ryerson students with an outstanding...
- 02.10.2010 - Acclaimed International Architectural Firms Partner to Design Ryerson University Student Learning Centre
- 03.30.2009 - Student Learning Centre: enhancing student life | Ryerson's new Student...
- 01.24.2008 - McGuinty government makes Ryerson University Student Learning Centre a reality...
Media Coverage
ABOUT
Transforming the vibrant intersection of Yonge and Gould streets (on the former site of retail landmark Sam the Record Man), the Student Learning Centre will give the entire Ryerson community an outstanding environment in which to study, collaborate and share ideas. Designed by two renowned architectural firms, the building will be accessible, digitally connected and ready to adapt to the newest modes of discovery.
DATES
START
February 2010
PROJECTED COMPLETION
Winter 2014
PROJECTED OCCUPANCY
Winter 2014
PROJECT TEAM
ARCHITECTS
Zeidler Partnership (Toronto)
Snøhetta (Oslo and New York)
CONTRACTOR
Demolition: Quantum Murray
General contractor: TBD
PROJECT MANAGER
CONSTRUCTION MANAGER
RETAIL BROKER
Quantity Surveyor:
STATUS
: January 2011
The appeal period for the rezoning application ended on December 29th with no objections from the public. City of Toronto Building Department is currently reviewing the building permit application; this permit represents formal permission from the City of Toronto to begin construction on the site. The shoring and excavation permit application is being processed by the city (shoring involves supporting the construction site so the street structure stays intact before excavation takes place).
The tender for shoring and excavation was closed on January 16th and the remaining tender packages for various building trades (e.g., electrical and plumbing contractors) are being prepared by Ellis Don. These tenders will be posted throughout 2012.
The architectural team is currently reviewing cost estimates from Ellis Don and Marshall Murray (Quantity Surveyor) on various construction components. This is a quality assurance process to ensure the estimates are aligned.
Ellis Don is scheduled to take possession of the site on February 1st and should have the construction hoarding (installing plywood around the perimeter) installed by February 16th
FACILITIES
- Total Space: Approximately 155,464 sq ft (14,443 m2)
- Retail at street level and below grade approximately 16,000 sq ft (1,486 m2)
- Home to a wide range of academic support services, to promote learning success
- A new Digital Media Zone
- Connected to the existing Library Building
- LEED Silver Certification with at least 50% green roof
Budget and Financing
Budget
$112 million
Financing
$45 million Government of Ontario
$45 million Internal Sources
$22 million Fundraising