You are now in the main content area

Grid-connected utility-scale battery facility

The Centre for Urban Energy has an outdoor facility connected to the 13.8 kilovolt (kV) Toronto Hydro grid and can test units in megawatt (MW) scale. The facility is monitored and controlled by a utility-grade supervisory control and data acquisition (SCADA) system via a fibre-optic link.

Read more about our Toronto Hydro utility-scale battery project or contact Karen Ho-Cespedes for more information.